Abraçadeira série pesada polipropileno verde 07841-01-2025011
- For the secure fastening pipelines
- With smooth inner face
- compressing
- Recommended for hoses and cables
- With rounded edges
Sales unit
€4.88
plus sales tax
Added to your shopping cart
Designation
Clip
Version 1
heavy duty series
DIN
DIN 3015-2
Form
B
Form definition
Inner face smooth
Main
material
polypropylene
Main
colour
green
B=Width
30,5
H=Height
46,5
L=Length
70
A
(metres)
1,5
D
for screw
M10
D1
(mm)
25
L1
45
Size
2
Tightening torque
(polypropylene)
(Nm)
12
~ CONFLICT MINERALS 3TG status
no intentional 3TG
~ CP65 substance 2 cancer
soots, tars, and mineral oils
~ PFAS free?
yes
~ REACH SVHC-free?
yes
~ RoHS conformity
yes, without exemption
~ TSCA 6(H) conformity
yes
Description
Material
Polipropileno PP.
Versão
verde.
Indicação
Abraçadeiras da série pesada conforme a norma DIN 3015-2 com superfície interna lisa, sem pré-carga. Recomendado para a fixação segura de mangueiras e cabos. As superfícies internas lisas e os raios de saída evitam danos às mangueiras e aos cabos.
Preferencialmente para ser usado como rolamento livre, onde o cabo não é fixado entre as metades da abraçadeira. Selecione o diâmetro (D1) das abraçadeiras ligeiramente maior do que o diâmetro do tubo a ser fixado.
As metades superior e inferior da abraçadeira são idênticas. O fornecimento ocorre em pares.
Preferencialmente para ser usado como rolamento livre, onde o cabo não é fixado entre as metades da abraçadeira. Selecione o diâmetro (D1) das abraçadeiras ligeiramente maior do que o diâmetro do tubo a ser fixado.
As metades superior e inferior da abraçadeira são idênticas. O fornecimento ocorre em pares.
Dados técnicos
Os torques de aperto dos parafusos especificados referem-se à instalação com placa de cobertura e parafusos sextavados conforme a norma DIN EN ISO 4014/4017.
Faixa de temperatura
-30 °C to +90 °C
Assembly
The recommended clamp spacings (A) are guidelines and apply to static loads.
Pipe bends: When installing pipe bends, the clamps must be placed directly in front of and behind the bend.
Fittings: The first clamp should be mounted immediately after the fitting to isolate the fitting from vibrations.
Valves: If valves are integrated into the pipeline, a clamp should be fitted in front of and behind the valve.
Pipe bends: When installing pipe bends, the clamps must be placed directly in front of and behind the bend.
Fittings: The first clamp should be mounted immediately after the fitting to isolate the fitting from vibrations.
Valves: If valves are integrated into the pipeline, a clamp should be fitted in front of and behind the valve.
Important note on downloading CAD models
In order to download our CAD models, you must log in first. If you have not created an account yet, please register under "My Account" (right side of the screen) and follow the instructions.